Commercial Solar Installation in Nigeria

Plan solar for an office, shop or commercial facility around measured demand, operating hours and continuity priorities. Discuss design, equipment supply and installation with Joshville.

Call +234 (0)806 747 1979

Design around the way your business operates.

A daytime office, a shop trading into the evening and a facility with large motors need different systems. Define the operating and continuity requirements before comparing equipment capacity or projected savings.

Trading and operating hours

Separate daytime consumption from evening and overnight demand. Measured load profiles help distinguish energy that can be supplied while solar is available from the energy that must be stored or supplied by an agreed fallback.

Essential and non-essential loads

Identify refrigeration, lighting, network equipment, pumps or production loads that have priority. Critical processes and temperature-sensitive operations need a specialist continuity assessment; capacity alone is not a guarantee of uninterrupted service.

Supply and integration

Review single/three-phase supply, motor starting, existing distribution and generator arrangements. Any integration, protection coordination, export restrictions and operating controls must be specified for the site.

From assessment to handover

  1. 1

    Capture the operating requirement

    Share representative demand/energy records, operating days and hours, outage patterns, essential processes and planned expansion. Electricity or fuel spend alone does not determine system size.

  2. 2

    Survey the electrical and physical site

    Assess roof or mounting structures, shading, access, cable routes, phase distribution, protection and existing equipment. Identify any structural or specialist studies needed before equipment is selected.

  3. 3

    Agree the proposal and responsibilities

    Review the equipment schedule, design assumptions, installation scope, continuity/fallback plan, exclusions, approvals and handover requirements. Compare projected energy and costs only under explicitly stated assumptions.

  4. 4

    Coordinate installation and commissioning

    Agree access and any planned shutdowns with the business. The project scope should state the commissioning checks, documentation, operating handover and after-sales responsibilities.

Joshville installation experience

Rows of solar panels at Joshville’s 240kW installation in Kaduna
Joshville’s 240kW Kaduna installation, completed in July 2026.

Our completed projects include 240kW in Kaduna (July 2026) and 100kW in Zaria (June 2026). Explore the project notes below, then talk to us about your site’s operating schedule, essential loads and expansion plans.

Bring these details to the first conversation

  • Location, business type and representative load/energy records.
  • Operating hours, essential loads and acceptable interruption/fallback arrangements.
  • Existing inverter, battery, generator and phase/distribution information.
  • Available roof or ground space, access restrictions and planned future demand.

Our base: 2 Ladipo Oluwole St, off Oba Akran Avenue (opp. Guinness Nig. Plc), Oba Akran, Ikeja 100282, Lagos. Site access, scope and scheduling are confirmed with the team.

Installation questions

Does Joshville handle commercial-scale solar projects?

Joshville completed a 240kW installation in Kaduna in July 2026 and a 100kW installation in Zaria in June 2026. Each new site still requires its own assessment, design and agreed delivery scope.

Can you tell me the system size from my electricity bill?

A bill helps establish energy use and cost, but does not show every simultaneous load, starting requirement or continuity need. Load records, operating schedules and site information are also needed.

Can the system work with our generator?

Potentially, depending on the selected inverter, generator, controls, supply architecture and operating requirements. Generator integration must be designed and confirmed for the exact equipment; it is not assumed for every hybrid inverter.

Is a commercial solar quotation a guaranteed savings figure?

No. Any projection needs explicit assumptions about generation, tariffs/fuel, loads, maintenance and backup operation. Ask for the equipment scope and the basis of the estimate rather than an unconditional payback promise.

Plan your next step

Let’s define the right installation for your site.

Share the requirements you know. Our team will help identify the measurements and site checks still needed.